George Fitos

Coleman Rail completed approximately 1.2KM of stacker rail welding for a stacker upgrade for Jetz Contracting, these works required timed interaction with live operations on a central Queensland coal mine, the project was completed 3 weeks early and during the 16 week project the mine met and beat its production target records, this impressive goal was achievable through a combined team approach to ensuring production was met during the outage, Coleman rail insured we made each milestone during the project and no re-welds or weld failures were encountered, this was a huge advantage to the install team allowing the impressive scheduled time gain.
Upon final survey the rails maximum tolerance over the 1.2km was within 2mm both vertical and horizontally.

Upon final survey the rails maximum tolerance over the 1.2km was within 2mm both vertical and horizontally.

The quick, professional, and highly organized team at Coleman Rail were an absolute pleasure to work with. I’d recommend them to likeminded businesses who seek hassle free project partners in all regions throughout the country.

© 2020 Coleman Crane Rail Pty Ltd All Rights Reserved
Site by Above & Beyond
Crane Rail Construction Australia